Hello, my name is Superyak Egor.
The theme of my diploma project is «The analysis of a time between failures and methods of increase in the wells equipped electrical submersible pumping units in Joint Stock Company Samotlorneftegaz».
During the operation I considered the principle of operation and the ESP device, and also analyzed its time between failures, basic reasons of failures, and methods of increase time between failures.
Installation of ESP unit consists of the submersible pump, the cable line lowered in a well on pumping and compressor pipes, and land electric equipment (transformer substation).
The scheme of ESP unit:
1 – wellhead equipment
2 – point portable;
3 – transformer;
4 – decline valve;
5 – – float valve;
6 – module-head;
7 – electric cable;
8 – electrical centrifugal pump;
9 – gas separator module pump;
10 – protector;
11 – submersible electric motor;
12 – system thermomanometrical.
Basic reasons of a failure are:
Leakage of tubing,
contaminations,
salts.
Also there is point - the reason isn't set
The dynamic of ESP on groups of execution is
- in 2011 group prevailed in a percentage ratio,
- in 2012-2013 its percentage ratio started to decrease, and the percent of ESP by 3 groups of execution started to increase.
On this slide we can see Slim-line ESP by company Novomet.
Novomet has once again pioneered ESP industry with slim line of ESP systems. Novomet leads the industry with innovative technology designed to maximize production from wells.
Applications:
operation in wells with technical limitations due to:
Advantages:
Disadvantages:
I offer implementation of ESP units in a small dimension 3 and 2A for increase oil production on the deposits which have entered a late stage of development and productivity of the low rate wells.
Tasks:
Rise of a gas-liquid compound from extracting wells with technical restrictions by the size of the submersible equipment.
• Implementation of the bypass diagram
• Maintenance of side trunks of extracting wells
• Features of development
• Unique equipment for operational strings with diameter114 mm.
The composition and complete set of small-size submersible installation are similar to installations produced in lots.
The main advantages of ESP 3 and 2A overall dimensions are:
• Oil recovery increase by the equipment descent directly in side trunks and thereby, increases depression on the formation.
• Output of wells from an idling well fund.
• Operations in deviation sections from a vertical to 90 degrees.
• Possibility of the organization of bypass system, maintenance of several formations, operations in the wells with technical restrictions by the equipment size (with min diameter 100мм).
Nowadays the course of the JSC SNG is directed to increase in a time between failures that is connected first of all to an economic profit, because the more a time between failures means the more production receives the enterprise.
My report is over and now I am ready to answer your questions.
Слайд 1
THE ANALYSIS OF TIME BETWEEN FAILURES AND METHODS OF INCREASE IT IN THE WELLS EQUIPPED ELECTRICAL SUBMERSIBLE PUMPING UNITS IN JOIN STOCK COMPANY SAMOTLORNEFTEGAS prepared by Superyak EgorСлайд 2
THE ELECTRICAL SUBMERSIBLE PUMPING UNIT
Слайд 3
Electrical Submersible Driven Gas separator String of tubing a pump Wellhead equipment Transformer Station of management The scheme of the equipment of an extracting well by ESP unit
Слайд 4
Basic reasons of a failure of wells are: -leakage of tubing, -contaminations, -salts.
Слайд 5
05.05.17 12:10 © THK-BP presentation name
Слайд 6
operation in wells with - drift diameter after workover displacement of casing exploration wells horisontal wells side tracks application with Y-tool for casing less than 5 multi-zone production
Слайд 7
ESP IN A SMALL DIMENSION 2A Conditional dimension Diameter of a pump , mm 69 2А Diameter of a motor , mm 81 Max dimension of the unit , mm 82 Reccommended diameter of a casing string , mm 102
Слайд 8
Слайд 9
THE MAIN ADVANTAGES OF ESP 3 AND 2A OVERALL DIMENSIONS ARE: Oil recovery increase by the equipment descent directly in side trunks and thereby, increases depression on the formation Output of wells from an idling well fund Operations in deviation sections from a vertical to 90 Possibility of the organization of bypass system, maintenance of several formations, operations in the wells with technical restrictions by the equipment size (with min diameter 100 мм )
Басня "Две подруги"
Мост из бумаги для Киры и Вики
Снежная книга
Дельфин: сказка о мечтателе. Серджио Бамбарен
В чём смысл жизни. // Д.С.Лихачев. Письма о добром и прекрасном. Письмо пятое